Seminar Category
Seminar Schedule
TG503 - (GE-LSTG) EHC Mk-I Steam Turbine Controls

5 days - 3.2 Continuing Education Units Awarded

The EHC System is divided into 3 major sections that involve the control of the turbine. These are Speed, Load, and Flow. This Seminar explains the purpose of each input and output signal of a given section along with an operational description of its functionality with respect to the control of the turbine. After a thorough discussion of each section, the association of each section to another is explained to provide a working knowledge of the EHC System in that the attendee knows the HOW, WHEN, and WHY of the signals used to control the valves; signals used for testing the various components of the turbine; and signals used for safeguarding the turbine. Insight into the design criteria of the circuits, priorities for calibration, sequence of calibration, calibration techniques, and need for accuracy is given as only a HPC Certified Instructor can accomplish.

Has an upgrade been considered for your EHC Mark-I? If so, this Seminar provides some useful information. When is an upgrade inevitable? What benefits are to be gained from an upgrade? Which vendor does one choose? How does one start in preparing for an upgrade? From the information gathered and learned from the Steam Turbine Controls Upgrade Seminar that HPC sponsored in June of 2002, these questions and more will be discussed.

Recommended for Engineers and E&I Technicians.

Note: This Seminar, normally 7-days in length, has been trimmed to fit a 5-day format. To accomplish this, several topics are listed as advance self-study, and HPC will forward advance reading materials to registrants to support this effort.

Seminar OUTLINE

  1. Introduction
  2. Control Panel Operation (Advance Study Assignment, Q&A only in Lecture)
  3. Valve Actuators
  4. Front Standard Operating Mechanisms
  5. Hydraulic Power Unit (Advance Study Assignment, Q&A only in Lecture)
  6. Operational Amplifiers (Advance Study Assignment, Q&A only in Lecture)
  7. Print Systems
  8. Input and Power Grounding System
    1. Power Supplies
    2. Grounding Systems
    3. Monitoring
  9. Signal Control Path
    1. Speed Control Unit
    2. Low Value Gates
    3. Speed / Acceleration Reference
    4. Frequency / Voltage Converters
    5. Wobbulator
    6. Backup Overspeed Trip
    7. Trip Anticipator
    8. Circuit Calibration
    9. System Logic
  10. Load Control Unit
    1. Stop Valve Amplifier
    2. Intercept Valve Amplifiers
    3. Control Valve Amplifier
    4. Load Reference Amplifier
    5. Load Limit / Runback
    6. Stage Pressure Feedback
    7. FA / PA Circuits
    8. Power Load Unbalance
    9. Early Valve Actuation
    10. Load Control Unit Logic
    11. Calibration Procedures
  11. Flow Control Unit
    1. Valve Position Units
    2. EL vs. EF
    3. Diode Function Generators
    4. Crack Points
    5. Valve Setting Procedures
    6. Valve Test Logic
  12. Alarm & Trip Logic
    1. Individual Trips
    2. MTS
    3. MTSV
  13. Line Up Instructions
  14. Maintenance
  15. Troubleshooting
  16. Upgrading the EHC
    1. Inevitable
    2. Vendor Choice
    3. Benefits Gained
    4. How To Start
  17. Seminar Conclusion

Satisfied Clients include: Alliant Energy - Duane Arnold Energy Center, Central Illinois Light Company - Edwards and Duck Creek Stations, Commonwealth Edison - Dresden, LaSalle & Quad Cities Nuclear Plants, Duke Energy - Oconee Nuclear Plant, GPU/Nuclear - Hope Creek, New England Power - Salem Harbor, MidAmerican Energy - Neal, New York Power Authority - Fitzpatrick Nuclear Plant, Niagara Mohawk Power - 9 Mile Point #2, Northern California Power Agency, PacifiCorp - Huntington Canyon, PECO Energy - Limerick Nuclear Station, Pennsylvania Power - Bruce Mansfield, Pennsylvania Power & Light - Susquehanna NES, Southern Nuclear Company - Plant Hatch

HPC Technical Services, 500 Tallevast Road - Suite 101, Sarasota, FL 34243 USA
Tel: 941-747-7733, Fax: 941-746-5374, E-mail:
yparker@hpcnet.com


© 1992-2010 H Parker & Company, Inc. (d/b/a HPC Technical Services)
All rights reserved.
Privacy Policy

SPOTLIGHT OF THE MONTH
»

TG327 Steam Turbine Operation Pracitces & Alarm Response on 4-8 September 2010 in Sarasota, FL

CERTIFICATION PROGRAMS
» Steam Turbine Certifications
» Gas Turbine Certifications
» Boiler Operator Certifications
» Mechanical Maintenance Certifications
» Generator Certifications
ADVANCED SEMINARS
» G706 Advanced Generator Maintenance Seminar
» TG706 Steam Turbine Technologies Seminar & Exhibit
UPCOMING EXHIBITS
» CTOTF on 13 Sep in Reno, NV
» 7EA Users Group on 27 Oct in Memphis, TN
» Power-Gen International on 14-16 Dec in Orlando, FL
» Energy Generation Conference on 25-27 Jan 2011 in Bismarck, ND
» Electric Power on 10-12 May in Rosemont (Chicago), IL
» Power-Gen Europe on 7-9 Jun in Milan, Italy
» WUTAB on 15-17 Jun
» ASME Power on 12-14 Jul in Denver, CO
» EPRI Workshop
Join Our Email List Email: