Seminar Category
Seminar Schedule
TG522 - (GE) Mk-V Steam Turbine Controls

5 days - 3.2 Continuing Education Units Awarded

This Seminar targets the need for technicians/engineers to operate, maintain, calibrate and troubleshoot control systems such that availability and reliability can be maximized. This is accomplished by thoroughly understanding concepts of steam turbine control systems and how to use maintenance screens to quickly determine problems.   HPC Technical Services’ staff experience is that all too often a lack of understanding of the ‘big picture’ leads to difficulties in troubleshooting operational problems.  Secondly, the Mk-V maintenance screens leave much to be desired.  Operations reports a ‘process alarm’.  They provide you an ‘alarm drop’ number.  Now what?  How do you get from an alarm drop number to the I/O terminal point inside the Mk-V cabinet or at the source?  All too often this simply takes too long when the goal is to get the machine started (or to keep it on).  The difficulty is the ability to make use of the OEM supplied documentation.  This Seminar not only includes these two important skills but also provides a description of how the control signals are developed.

Topics include:  Mk-V Hardware Familiarization, Operator Interface, Use of Documentation, Big Block Language, Control Overview, Speed Control Algorithms, Load Control Algorithms, Pressure Control Algorithms, Flow Control Algorithms, Power Load Unbalance, Automatic Turbine Startup, Valve Position Demand, Hydraulic Systems, Protective Circuits, On-Line and Off-Line Tests, Calibration, and Editing.

OBJECTIVES
Upon successful completion of this Seminar the participant should be able to:

  1. GE, Mark, Mk, Mk-V, Speedtronic, Steam Turbine, Turbine, Controls, Training, HMI, IDemonstrate the ability to use OEM provided documentation that will include the Control Specifications, Control Sequence Program, I/O Configuration, CSP Cross Reference, Alarm Drop List, Application Manual, and P&IDs.
  2. Demonstrate the understanding of the Mk-V hardware components, how they are accessed, and how they communicate.
  3. Demonstrate the ability to troubleshoot an equipment alarm, given an Alarm Drop Number.
  4. Demonstrate the ability to interpret the more routine diagnostic alarms and recognize appropriate actions.
  5. Demonstrate the ability to follow the major "control signal path" through a Control Sequence Program.
  6. Demonstrate the ability to trace the derivation of a command signal to the servomechanisms.
  7. Demonstrate the knowledge necessary to calibrate turbine valve mechanisms.
  8. Demonstrate the ability (or knowledge -- based upon equipment availability) to more efficiently use the Mk-V <I> /<HMI> screens for evaluating/calibrating systems.
  9. Demonstrate the ability (or knowledge -- based upon equipment availability) to force logic to facilitate calibration.
  10. Describe how to change constants or re-program ladder logic such as to add contact input/outputs, add alarms, and/or alter sequencing.
  11. Given plant drawings, trace a signal to/from a field device through appropriate terminal boards, through circuit boards, to a digital "signal name".
  12. Demonstrate the ability to follow signal flow to/from the <P> core to trip/reset the machine.
  13. Describe differences between a <Q> trip and a <P> trip. Demonstrate an understanding of on-line and off-line test sequences.

Seminar OUTLINE

  • Monday
    • Introduction
    • Mk-V Hardware Familiarization
    • Operator Interface: <I> or <HMI>, <BOI>, Displays and Logging
  • Tuesday
    • Documentation: I/O Report, I/O Configuration, Reading a CSP, Application Manual, Control Specifications, Contact Inputs/Output, Sequencing, Analog Input/Output
    • Big Block Language
    • Control Overview
    • Speed Control: Description, Algorithm, and Calibration
  • Wednesday
    • Load Control: Description, Algorithm, and Calibration
    • Pressure Control: Description, Algorithm, and Calibration
    • Power /Load Unbalance: Description, Algorithm and Calibration
    • Automatic Turbine Startup Description
  • Thursday
    • Valve Position Demand: Description, Algorithm, and Calibration
    • Hydraulic Systems
  • Friday
    • Protective Circuits
    • On-Line and Off-Line Tests
    • Program and Field Modifications

HPC Technical Services, 500 Tallevast Road - Suite 101, Sarasota, FL 34243 USA
Tel: 941-747-7733, Fax: 941-746-5374, E-mail:
yparker@hpcnet.com


© 1992-2010 H Parker & Company, Inc. (d/b/a HPC Technical Services)
All rights reserved.
Privacy Policy

SPOTLIGHT OF THE MONTH
»

TG301 Steam Turbine Generator Maintenance on 23-27 August 2010 at TurboCare's Facility in Houston, TX

CERTIFICATION PROGRAMS
» Steam Turbine Certifications
» Gas Turbine Certifications
» Boiler Operator Certifications
» Mechanical Maintenance Certifications
» Generator Certifications
ADVANCED SEMINARS
» G706 Advanced Generator Maintenance Seminar
» TG706 Steam Turbine Technologies Seminar & Exhibit
UPCOMING EXHIBITS
» CTOTF on 13 Sep in Reno, NV
» Power-Gen International on 14-16 Dec in Orlando, FL
» Energy Generation Conference on 25-27 Jan 2011 in Bismarck, ND
» Electric Power on 10-12 May in Rosemont (Chicago), IL
» Power-Gen Europe on 7-9 Jun in Milan, Italy
» WUTAB on 15-17 Jun
» ASME Power on 12-14 Jul in Denver, CO
Join Our Email List Email: